RUSSELL ROAD BRIDGE BEAMS
In June 2016, Georgiou delivered eight, 41-metre Tee-Roff bridge beams and Mechanically Stabilised Earth (MSE) panels for the Russell Road Upgrade Project in Perth's south.
![Image for RUSSELL ROAD BRIDGE BEAMS](https://www.georgiou.com.au/wp-content/uploads/2022/03/ProjectsWA_Engineering_Russell-Road_01.jpg)
Client
Main Roads WA
Location
Hazelmere Western Australia 6055, Australia
Duration
Mar 2016 - Jun 2016
Cost
NFP
Georgiou delivered eight, 41-metre Tee-Roff bridge beams and Mechanically Stabilised Earth (MSE) panels for the Russell Road Upgrade Project in Perth’s south.
Manufactured in 10 weeks, the team utilised their in-ground stressing bed (80m x 6.25m x 2.5m) which can produce beams in excess of 300 tonnes and up to 66 metres in length, if required.
Each Tee-Roff beam weighed 191 tonnes each and the project saw 55 personnel at peak.
Georgiou delivered the beams as part of the $105 millionĀ Aubin Grove Train Station project.