COOMERA CONNECTOR STAGE 1 NORTH
Georgiou Group, in 40:60 joint venture with Acciona, is delivering the Coomera Connector Stage1 North package for repeat client, Queensland Department of Transport and Main Roads.
![Image for COOMERA CONNECTOR STAGE 1 NORTH](https://www.georgiou.com.au/wp-content/uploads/2023/04/Website-Banner-17.png)
Client
Queensland Department of Transport and Main Roads.
Location
Coomera Queensland 4209, Australia
Duration
End 2021 – 2025
Cost
N/A
Georgiou Group, in 40:60 joint venture with Acciona, is delivering the Coomera Connector Stage1 North package for repeat client, Queensland Department of Transport and Main Roads.
The project scope of works includes:
- A 4-lane, median divided arterial road between Chainage 29600 and Chainage 32900 with future widening to 6-lanes into the median, including ramp connections to Shipper Drive and Helensvale Road
- A 6-lane, median divided bridges, including a grade separated shared path facility
- Upgrades to Helensvale Road and Shipper Drive
- Adjustments and connections to City of Gold Coast and DTMR Controlled roads
- Facilities for pedestrians, cyclists, persons with a disability, and other vulnerable road users
- Modifications and adjustments to existing infrastructure including service infrastructure within the Queensland Rail Corridor, to maintain access and function of the rail