Feature Project
| Perth Arena Bus Bridge |

|
| Georgiou Engineering is responsible for the design and construction of the new Perth Bus Bridge which will be owned and operated by the Public Transport Authority. The works include construction of an incrementally launched double curvature bridge over a live rail and operating busway, with multiple stakeholders and complex traffic management. |
|
Berth 10 Reconstruction |
 | |
| This project being undertaken by the Thiess Georgiou Joint Venture, involves replacing an existing wharf that was built in the 1950s with a stronger structure so that it can be used for container ships as well as roll-on/roll-off vessels. |
Read More
|
AMC Transfer System & Interface Wharf |
 | |
| The project involves the construction of a new wharf and associated infrastructure required to move Collins-Class Submarines (and other nominated vessels) from a floating dock to an enclosed maintenance facility at the Australian Marine Complex in Henderson. |
Read More
|
Bullabulling 15ML Water Tank |
 | |
| Bullabulling Reservoir is located in ‘zone 6’ of the G&AWS Main Conduit, 60km West of Kalgoorlie. |
Read More
|
Boddington Gold Mine Expansion Project |
 | |
| One of four civil works packages released by AKCMR for the construction of the new Boddington Gold Mine, this package involves the construction of the secondary crushing structures, coarse screening plants, the stockpile reclaim vault and miscellaneous buildings and foundations. |
Read More
|
Perth Arena Bus Bridge |
 | |
| Georgiou Engineering has recently completed the design and construction of the new Perth Arena Bus Bridge for the Public Transport Authority. |
Read More
|
Wesfarmers LNG Plant |
 | |
| Linde Engineering engaged Georgiou to undertake the civil works and concrete works for the new Wesfarmers LNG Plant. |
Read More
|
Port Kembla Eastern Basin Berth 103 |
 | |
| The proposed wharf and back-up area is located at Port Kembla in the Inner Harbour Eastern Basin, NSW. |
Read More
|
Port Kembla Multi-Purpose Berth No. 3 |
 | |
| Berth #3 was recently completed and successfully carried out by Georgiou’s Engineering division on behalf of the Port Kembla Port Corporation. |
Read More
|
Wells Terminal Civil Works |
 | |
| Western Power required a 330kV/132kV Terminal to be located 5 kilometres west of the Boddington Gold Mine Expansion Project. |
Read More
|
Cockburn Road Realignment & Rail Tunnel Construction |
 | |
| The completion of several stages within the Port Coogee Redevelopment relied on the timely completion of the Cockburn Road Realignment works undertaken on behalf of Australand. |
Read More
|
Kwinana Power Station Discharge Canal Refurbishment |
 | |
| Kwinana Power Station is situated approximately 40km south of the Perth CDB in Naval Base and is adjacent to Cockburn Sound. |
Read More
|
Port Kembla Rail Loop Overbridge |
 | |
| Construction of a new three span bridge over five operational railway lines was required to be carried out with nil disruption to rail services. |
Read More
|
Hallam Valley Main Sewer Design and Construction |
 | |
| The Pakenham-Narre Warren region of Melbourne is a rapidly expanding urban development area south east of Melbourne. |
Read More
|
NewGen Seawater Intake Structure – Cockburn Power Station |
 | |
| Cockburn Power Station is situated approximately 40km south of the Perth CDB in Naval Base and is adjacent to Cockburn Sound. |
Read More
|